Task Flow Chart
/task-dependency-graph/
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Mermaid flowchart
flowchart TD t1["01 Requirements<br/>PM"] t2["02 Wireframes<br/>Design"] t3["03 API design<br/>Backend"] t4["04 Visual design<br/>Design"] t5["05 Frontend<br/>Frontend"] t6["06 Backend<br/>Backend"] t7["07 Integration test<br/>QA"] t8["08 Domain and servers<br/>Infra"] t9["09 Launch<br/>Team"] t1 --> t2 t1 --> t3 t1 --> t8 t2 --> t4 t2 --> t5 t3 --> t5 t3 --> t6 t4 --> t5 t5 --> t7 t6 --> t7 t7 --> t9 t8 --> t9 classDef done fill:#a9b9ff,stroke:#111,color:#111 classDef doing fill:#b9d8ff,stroke:#111,stroke-width:3px,color:#111 class t1,t2 done class t3 doing
Comments
About this tool
Why map tasks in a dependency graph
Team work is full of ordering. Access has to be granted before a pipeline can be built, and designs have to land before screens are coded. A plain to-do list hides these links, so you keep asking who is waiting on whom and what can start right now. A picture that links tasks with arrows from prerequisite to follower is called a dependency graph or precedence diagram, and the PERT chart used in project management grows from the same idea.
Read moreShow less
This tool lets you add tasks, pick a prerequisite or drag the dot under a card onto another card, and it lays out the graph top to bottom in steps. Each card has a status (not started, in progress, done), an owner and notes. When every prerequisite of a task is done, the task turns ready, so the next move is obvious. Progress sits at the top, and you can export an image, a JSON file or Mermaid flowchart code.
How steps and states are worked out
Tasks and arrows form a directed acyclic graph: arrows have a direction, and following them must never loop back to where you started, otherwise no order exists. That is why links that would create a loop are refused with a message. Tasks without prerequisites go in step 1, and every other task goes one step below its latest prerequisite. Within a step, cards are ordered by the positions of their prerequisites so arrows cross less.
A card you mark done or in progress shows that status. A card not yet started is ready when all its prerequisites are done and waiting otherwise, with a count such as 2/3. In the built-in example of launching a web service, finishing requirements and wireframes makes visual design and domain setup ready, while frontend work waits for both API design and visual design.
PERT, known from the US Navy Polaris program in the late 1950s, adds a duration to each task to find the total schedule and the critical path. This tool deliberately skips durations and focuses on order and status. It can, however, produce Mermaid code, a text syntax for diagrams that renders as a picture in GitHub Markdown and Notion code blocks.
Using it in practice
Team leads can scan the ready cards first: an unowned ready task means idle work, and a long tail of waiting cards behind one task marks a bottleneck. Engineers can plan setup work where order matters, such as permissions, repositories and networking, then paste the Mermaid code into the repository docs. Students of project management can practice drawing precedence diagrams, and the same approach works for moving house or planning an event.
Limits and storage
The chart is saved only in this browser and never sent to a server. To move it to another device or person, export JSON and import it there; clearing browser data can erase it, so keep important charts as JSON. If a very large chart exceeds the storage limit, a notice appears and autosave stops. Because notes may contain internal details, share links do not include the chart. There is no real-time collaboration, no due dates and no critical path calculation. On narrow phone screens the chart is shown as a list of steps, and drag-to-link is available on wider screens only.
Popular tools
FAQ
How do I build a task flow chart?
Type a task name, optionally pick its prerequisite and add it. Link existing tasks with the Before and After boxes, or on a wide screen drag the dot under a card onto another card. Layout is automatic.
What is the difference between ready and waiting?
Among tasks not started yet, those whose prerequisites are all done are ready; the rest are waiting, with a count of finished prerequisites.
Is this a PERT chart?
It shares the structure of tasks linked by dependencies, but PERT also uses durations to compute the schedule and critical path. This tool only tracks order and status.
What can I do with the Mermaid output?
Open the Mermaid flowchart section and press Copy to get flowchart code. Paste it into GitHub Markdown or a Notion Mermaid block to render the same chart, with done and in progress tasks colored.
Where is my chart saved?
Only in this browser, automatically. Use Export JSON to keep a copy or move it to another device, and Import JSON to load it.
Why was my link refused?
A task cannot depend on itself, the same link cannot be added twice, and a link that would make arrows loop back is refused because no order would exist.